Ceiling tiles. If I can’t walk a space myself I demand floor to ceiling pictures from all corners and points of interest. Finished dimensions are often more accurate than construction drawings.
Cookies
We and selected partners, use cookies or similar technologies as specified in the cookie policy and privacy policy.
You can consent to the use of such technologies by closing this notice.
Recent Comments
B is tempting, but needs analysis should be agnostic to budget.D looks best.
The first thing should be to unplug power from all devices, then inspect them individually for damage.
It is B, but the architect and interior design team will likely choose glass walls, mesh chairs and reconfigurable granite tables.
B. Loopback mocks a TCP/IP connection internally on the 127.0.0.0 subnet.
D. The sooner the better, especially with long lead items like projection screens.
Ceiling tiles. If I can’t walk a space myself I demand floor to ceiling pictures from all corners and points of interest. Finished dimensions are often more accurate than construction drawings.