Jim Griffith

Senior System Designer, ELB

Company Type

AV/IT Integration

Department

Consulting Design Engineering Research Solutions Development

Language

English

Influencer Of

Recent Comments

Oct 15, 2024

B is tempting, but needs analysis should be agnostic to budget.D looks best.

Apr 09, 2024

The first thing should be to unplug power from all devices, then inspect them individually for damage.

Feb 06, 2024

It is B, but the architect and interior design team will likely choose glass walls, mesh chairs and reconfigurable granite tables. 

Aug 29, 2023

B. Loopback mocks a TCP/IP connection internally on the 127.0.0.0 subnet.

Aug 01, 2023

D. The sooner the better, especially with long lead items like projection screens.

Jul 25, 2023

Ceiling tiles. If I can’t walk a space myself I demand floor to ceiling pictures from all corners and points of interest. Finished dimensions are often more accurate than construction drawings.